
This is a really nice video for folks new to the industry who want to learn about drilled shafts. It has some great photos and hits the high points of what the advantages of drilled […]
This has to be one of the most complex geotechnical engineering problems I’ve heard of for a building, if not for any kind of project. For starters, beneath the proposed 10-story office building referred to as Cannon Place lies the Cannon Street Train Station built in 1868. Also beneath the site are walls and foundations of a Roman Governor’s palace. In order to accommodate these features, the building has 21-m cantilevers at each end, with the load bearing happening over two groupings of columns at the 1/3 points. In section it looks quite like a 3-span bridge…without the abutments and stacked 10-stories tall! More after the break. (Images by New Civil Engineer) […]
The IHC Fundex 5600 is the newest and largest multifunctional foundation drill rig in Dutch equipment maker’s line. This rig has a leader or mast that is 50 to (optionally) 56 meters in length (164-184 […]
Copyright © 2007-2020 by Randy Post