• Twitter
  • Facebook
  • LinkedIn
  • YouTube
GeoPrac.net

Our Sponsors

  • Home
  • About
    • Our Sponsors
  • Articles
  • News
    • Search By Tag
  • Events
    • Events Main
    • Add an Event
    • Webinars
    • Conferences
    • Calls For Abstracts
  • Resources
    • Links
  • Contact Us
News Ticker
  • [ March 30, 2026 ] Polyurethane 101 Webinar Tomorrow, March 31 Available Resources
  • [ March 27, 2026 ] Keller CEO Describes Their Business Available Resources
  • [ March 23, 2026 ] Landslide Emoji Coming to iOS 26.4 Available Resources
  • [ February 9, 2026 ] Underground Leak Sealing Restores Coal Terminal Operations Project Related
  • [ February 4, 2026 ] Ground investigation for civil infrastructure gets more robust with integration of lab and field geotechnical data Press Releases
HomeNewsMiscellaneousNevada’s Yucca Mountain Case Versus DOE Thrown Out

Nevada’s Yucca Mountain Case Versus DOE Thrown Out

December 14, 2007 rockman Miscellaneous Comments Off on Nevada’s Yucca Mountain Case Versus DOE Thrown Out

 

Share this:

  • Tweet
  • Email a link to a friend (Opens in new window) Email
  • Share on Reddit (Opens in new window) Reddit
  • Share on WhatsApp (Opens in new window) WhatsApp
  • More
  • Share on Tumblr
  • DOE
  • Nevada
  • nuclear waste
  • Yucca Mountain
Previous

Massive Landslide in B.C. Triggers Tsunami in Lake

Next

New White Paper on Earth Fissures

Related Articles

Yucca Mountain Nuclear Waste Repository Schematic Drawing by US Nuclear Regulatory Comission
Project Related

Yucca Mountain Solution for Nevada’s Budget Deficit?

November 24, 2008 rockman Project Related Comments Off on Yucca Mountain Solution for Nevada’s Budget Deficit?

Yucca Mountain Nuclear Waste Repository Schematic Drawing by US Nuclear Regulatory ComissionThe Center for Yucca Facts has presented a letter to the chairman of the Spending and Government Efficiency Commission (SAGE) of the State of Nevada recommending that an objective look at the proposed Yucca Mountain Nuclear Waste Repository might show that it provides a solution to Nevada’s budgetary dilemmas. More after the break.

[…]

Share this:

  • Tweet
  • Email a link to a friend (Opens in new window) Email
  • Share on Reddit (Opens in new window) Reddit
  • Share on WhatsApp (Opens in new window) WhatsApp
  • More
  • Share on Tumblr
Available Resources

Yucca Mountain – $32 Billion More

July 17, 2008 rockman Available Resources Comments Off on Yucca Mountain – $32 Billion More

Thanks to Harold at the Ontario-geofish blog, I came accross this AP article that releases the first Yucca Mountain nuclear waste repository cost estimate update since 2001. The US DOE now puts the cost of the facility at $90 billion, up $32 billion from that 2001 estimate. Of course that estimate is slightly deceptive. It covers the $9 billion already spent and 100 years of operation. Perhaps the bigger issue is funding has not been secured largely in part to the efforts of Senate Majority Leader Harry Reid (Democrat-NV). If a steady stream of money can be secured, the best case scenario for the facility is a 2020 opening. 

I also found a neat blog called Yucca Facts that has a refreshing perspective on the facility that is pro-science if not necessarily pro-Yucca. They also have a commentary about this latest DOE announcement and some commentary on Senator Reid.

[…]

Share this:

  • Tweet
  • Email a link to a friend (Opens in new window) Email
  • Share on Reddit (Opens in new window) Reddit
  • Share on WhatsApp (Opens in new window) WhatsApp
  • More
  • Share on Tumblr
Press Releases

Yucca Mountain Moving Forward

June 5, 2008 rockman Press Releases Comments Off on Yucca Mountain Moving Forward

US Nuclear Regulatory Commission – No. 08-106 – June 3, 2008

NRC RECEIVES DOE’S LICENSE APPLICATION TO CONSTRUCT HIGH-LEVEL NUCLEAR WASTE REPOSITORY AT YUCCA MOUNTAIN

The Nuclear Regulatory Commission received an application today from the U.S. Department of Energy for a license to construct the nation’s first geologic repository for high-level nuclear waste at Yucca Mountain, Nev.

“We are ready to get to work on this challenging review,” said NRC Chairman Dale E. Klein. “Congress has given the NRC a strict timetable for reviewing this application, and I want to assure the American people that we will perform an independent, rigorous and thorough examination to determine whether the repository can safely house the nation’s high-level waste. The NRC’s licensing decision will be based entirely on the technical merits.” [Editor] Read on for the rest of the press release [/Editor]

 

[…]

Share this:

  • Tweet
  • Email a link to a friend (Opens in new window) Email
  • Share on Reddit (Opens in new window) Reddit
  • Share on WhatsApp (Opens in new window) WhatsApp
  • More
  • Share on Tumblr

Our Sponsors

Upcoming Events

Check out these upcoming events for geoprofessionals! You can submit your own events, or go to calendar view as well.

Notice
There are no upcoming events.

Our Sponsors

Random Post by Image (Feeling Lucky?)

  • Failure of MSE retaining wall on US 36 between Denver and Boulder
  • Roof drills on the TBM installing 20-ft long rock bolts in the ceiling of the Niagara Tunnel
  • Bentley Consolidates Geotechnical Software Under Seequent
  • O-Cell frame being lowered into drilled shaft excavation at New Mississipi River Bridge on I-70 project.
  • Shallow foundation damage causes building collapse in Alabama after Hurricane Ivan in 2004
  • Geotechnical Asset Management - Implementation Concepts and Strategies by Central Federal Lands of the FHWA
Follow on Facebook
Recent Comments
  • Randy Post on Video of Highway 101 Landslide in California
  • GE Reviewer on San Francisco Millennium Tower Has Settled 16 Inches
  • Agus on New FHWA Soil Nail Manual Addresses LRFD, Hollow Bars
  • geoengineer Spain on Engineering Geologists vs Geological Engineers vs Geotechnical Engineers
  • Blaine J. Guidry, P.E. on A Whole Lotta Shakin’ Goin’ On: Center for Geotechnical Modeling Facilitates Seismic Research

Copyright © 2007-2020 by Randy Post