NRC RECEIVES DOE’S LICENSE APPLICATION TO CONSTRUCT HIGH-LEVEL NUCLEAR WASTE REPOSITORY AT YUCCA MOUNTAIN
The Nuclear Regulatory Commission received an application today from the U.S. Department of Energy for a license to construct the nation’s first geologic repository for high-level nuclear waste at Yucca Mountain, Nev.
“We are ready to get to work on this challenging review,†said NRC Chairman Dale E. Klein. “Congress has given the NRC a strict timetable for reviewing this application, and I want to assure the American people that we will perform an independent, rigorous and thorough examination to determine whether the repository can safely house the nation’s high-level waste. The NRC’s licensing decision will be based entirely on the technical merits.†[Editor] Read on for the rest of the press release [/Editor]
Apparently the French are working on their nuclear waste storage facility, they already have a research laboratory constructed about 1/2-km underground. The actual repository will come on line around 2025 and be one of the […]
Since the Yucca Mountain nuclear waste repository has gotten the axe from President Obama, nuclear power plants around the country are faced with the prospect of virtually indefinite "temporary" storage of their nuclear waste in the form of spent fuel rods. The US Department of Energy has a legal obligation to find a permanent disposal facility for the spent fuel, and the agreements currently in place presumed that Yucca Mountain would be accepting nuclear waste by 2025 which clearly won’t happen. (Photo of dry cask temporary storage method for spent nuclear fuel from Connecticut Yankee). More after the break. […]
Copyright © 2007-2020 by Randy Post
