Related Articles
Innovative Foundation System for London Office Building
This has to be one of the most complex geotechnical engineering problems I’ve heard of for a building, if not for any kind of project. For starters, beneath the proposed 10-story office building referred to as Cannon Place lies the Cannon Street Train Station built in 1868. Also beneath the site are walls and foundations of a Roman Governor’s palace. In order to accommodate these features, the building has 21-m cantilevers at each end, with the load bearing happening over two groupings of columns at the 1/3 points. In section it looks quite like a 3-span bridge…without the abutments and stacked 10-stories tall! More after the break. (Images by New Civil Engineer) […]
Geotechnical work begins on Sydney’s $2.5B North West Rail Link
Geotechnical drilling has commenced for a massive Australian rail that will consist of Australia’s longest rail tunnel at 15.5km between Epping and Kellyville. The overall route will be 23km long. The investigations consist of 150 […]
Fugro UK offers Free Courses to Consultants and Engineers
Fugro is offering free 1, 2 and 3-day classes on water investigation techniques, cone penetration testing, and engineering and environmental geophysics at several UK locations in the coming months. The water services course had it’s […]
