Nortex employees stabilizing Houston area freeway with TerraThane Polyurethane Foam
Press Releases

Nortex and TerraThane Stabilize Houston Area Highways

Houston’s Highways, Some of Busiest in Nation, Use Innovative TerraThane Polyurethane Foam Technology to Repair Bad Bridge Approaches, Uneven Joints, and Roadway Depressions.

Nortex employees stabilizing Houston area freeway with TerraThane Polyurethane Foam

MOUNT AIRY, NC—Highways around Houston, TX, known as one the nation’s worst cities for traffic behind Los Angeles, D.C., and Atlanta, need constant repair, but can’t be closed while the work is done. Nortex Concrete Lift and Stabilization, Inc., a Ft. Worth, TX company, recently completed a whirlwind repair project on one of the city’s busiest corridors in the NE quadrant where I-10, 610 Loop, I-59, and I-69 feed millions of cars daily to, from, and around Harris County.

Normal groundwater erosion beneath the highways causes the concrete highway slabs to drop, roadway depressions, uneven bridge approaches, and uneven joints that make driving bumpy and uncomfortable, dangerous, and causes severe wear and tear on automobiles.

To make the repairs, the Texas Department of Transportation, TXDOT, brought in Nortex. The company carefully planned out the repairs for the half million pound project, and sent out four crews each with it’s own box truck rig to use a relatively new technology called “foamjacking.” Foamjacking uses high-density polyurethane foam to fill the subterranean voids, and lift the concrete slabs to proper level. “We’ve been lifting and stabilizing roadways with polyurethane foam since we got into the business back in 2003,” says Casey Derosa, asst. gen. mgr. of Nortex. “It’s a far superior method versus the old way of mudjacking.” Mudjacking is a ubiquitous term for a mix of mud, sand, cement, crushed limestone, and water hydraulically pumped into large holes drilled into the concrete slabs to fill voids and level the slabs. Mudjacking uses more and much larger equipment, and requires larger holes to be drilled. It typically requires the roadway to be closed much longer than foamjacking, and takes more time to clean up.

[Editor] Click through for the rest of the press release from GeoPrac sponsor NCFI Polyurethanes. [/Editor]

[…]

Fugro geotechnical vessel MV Bucentaur
Project Related

Fugro Completes Major Offshore Geotechnical Investigation

Fugro has completed one of the largest offshore geotechnical investigations in history according to Hydro-International.com. The investigation was performed by two vessels, MV Greatship Manisha and MV Bucentaur (pictured here), for DONG Energy’s 1.2 gigawatt […]

No Picture
Available Resources

2015 Tunneling Industry Forecast

What will 2015 hold for the tunneling industry? Tunnel Business Magazine asked a panel of 4 industry experts that question. The panel consisted of a Colorado School of Mines Professor as well as reps from […]

High-tech pothole-seeking van from Northeastern University
Available Resources

The van that goes looking for potholes

A team from Northeastern University has a very interesting van used for quantitatively assessing pavement condition using a variety of sensors. They use cameras, laser profilers, accelerometers on axles, pressure sensors in the tires, microphones, […]

Introducing the LS(TM)250 MiniSonic(TM), a compact sonic rig for a wide variety of environmental, geotechnical, water and mining projects.
Press Releases

Introducing the LS™250 MiniSonic™, a Versatile Compact Sonic Rig

Introducing the LS(TM)250 MiniSonic(TM), a compact sonic rig for a wide variety of environmental, geotechnical, water and mining projects.SALT LAKE CITY, April 13, 2015 /PRNewswire/ — Boart Longyear (www.BoartLongyear.com), the world’s leading provider of integrated drilling services and drilling products, is proud to introduce the LS™250 MiniSonic™, a compact rig suitable for a wide variety of environmental, geotechnical, water and mining projects.

Capable of drilling to depths of up to 250 feet (78m) when used with 4.75 inch (121mm) casing, the wide 600mm rubber tracks provide low ground pressure (.28 bar/4psi) and make it perfect for jobs in the most sensitive and fragile terrains. Plus, its smaller footprint makes it appropriate for projects with small drill pads, environmentally sensitive areas or hard-to-reach sites and requires less support equipment – making it a low-cost solution for a variety of mining, environmental, geotechnical and infrastructure drilling projects.

[Editor] Click through for the rest of the press release from Boart Longyear. [/Editor]

[…]