Utah Poised to Adopt Geologic Hazard Ordinances
Geosyntec and Golder have teamed up with the Interstate Natural Gas Association of America (INGAA) to produce a reference manual: “Guidelines for Management of Landslide Hazards for Pipelines“. This guidance document is the result of […]
Audio files and PowerPoint presentations from an ENR-moderated panel discussion on June 8, 2010 discussing US seismic codes in the context of the observations made from the recent Haiti and Chile earthquakes. The 2010 earthquakes […]
DENVER, CO–(Marketwire – May 10, 2011) – ACH Foam Technologies supplied an estimated 2.1 million cubic feet of EPS Geofoam to the second largest Geofoam project in the US: the West Valley TRAX line. Utah Transit Authority (UTA) constructed the light rail line to a new hub in West Valley near Salt Lake City. Projected to cost $200 million and span 5.1 miles, the project required 639 truckloads or 750,000 cubic yards of the lightweight fill material. ACH Foam delivered the first truckloads in Febuary 2009; Geofoam installation was complete by January 2010. [Editor] Click through for the rest of the press release from ACH Foam Technologies. [/Editor]
Copyright © 2007-2020 by Randy Post
